We are assessing future options in Australia and Indonesia totalling around 10 mtpa by 2020.
The Arrow LNG project (Shell share 50%) is based on coalbed methane, with two liquefaction trains having a combined capacity of 8 mtpa in the first phase. The purchase of Bow Energy in 2011 will allow us to meet the current two train requirements and subsequently develop future expansion.
Shell has a 20% stake in Browse and a 34% stake in the Greater Sunrise floating LNG project, both of which are operated by Woodside. In 2011, Shell also entered the 2.5 mtpa Abadi floating LNG project in Indonesia with a 30% stake.