Shell has a strong portfolio of pre-final investment decision options that can support production growth up to 2020. We have about 30 projects in the concept-selection or design phase, around half of which are to be operated by Shell. The projects include not only traditional exploration and production activities, but also involve deep water, LNG, tight gas, liquids-rich shale and heavy oil. In total, these projects represent some 13 billion boe of resources. The main areas of potential growth are the deep-water fields such as the Gulf of Mexico, tight-gas and liquids-rich shale resources (mainly in North America) and LNG projects in Oceania.
Download XLS |
POTENTIAL 2014–2020 START-UPS | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Phase |
Project |
Country |
Shell interest (%) |
Peak production 100% (kboe/d) |
LNG 100% capacity (mtpa) |
Strategy theme |
Shell operated | ||||
| |||||||||||
Concept selection |
AOSP Debottlenecking |
Canada |
60 |
55 |
|
Future opportunities |
| ||||
|
Appomattox |
USA |
80 |
150 |
|
Deep water |
| ||||
|
Basrah Gas Company |
Iraq |
44 |
|
|
Future opportunities |
| ||||
|
Bonga North |
Nigeria |
55 |
200 |
|
Deep water |
| ||||
|
Bosi Field Development |
Nigeria |
44 |
130 |
|
Deep water |
| ||||
|
Geronggong |
Brunei |
50 |
|
|
Deep water |
| ||||
|
Gorgon T4 Expansion |
Australia |
25 |
250 |
5 |
Integrated gas |
| ||||
|
LNG Canada |
Canada |
40 |
|
12 |
Integrated gas |
| ||||
|
Majnoon FFD [A] |
Iraq |
45 |
100 |
|
Future opportunities |
| ||||
|
Nigeria NLNG Train 7 |
Nigeria |
26 |
220 |
8.4 |
Integrated gas |
| ||||
|
Pearls – Khazar |
Kazakhstan |
55 |
50 |
|
Future opportunities |
| ||||
|
Pennsylvania |
USA |
100 |
|
|
Downstream engine |
| ||||
|
Sunrise LNG |
Australia |
34 |
120 |
4.1 |
Integrated gas |
| ||||
|
Tukau Timur |
Malaysia |
50 |
55 |
|
Upstream engine |
| ||||
|
Vito |
USA |
51 |
100 |
|
Deep water |
| ||||
|
West Qurna FFD |
Iraq |
15 |
200 |
|
Future opportunities |
| ||||
|
Zabazaba |
Nigeria |
50 |
170 |
|
Deep water |
| ||||
|
Zaedyus |
French |
45 |
|
|
Deep water |
| ||||
Design |
Abadi FLNG Phase 1 |
Indonesia |
30 |
65 |
2.5 |
Integrated gas |
| ||||
|
AOSP Debottlenecking |
Canada |
60 |
20 |
|
Future opportunities |
| ||||
|
Arrow Energy LNG |
Australia |
50 |
160 |
8 |
Integrated gas |
| ||||
|
BC-10 Massa Phase 3 |
Brazil |
50 |
30 |
|
Deep water |
| ||||
|
Bokor Phase 3 |
Malaysia |
40 |
25 |
|
Upstream engine |
| ||||
|
Bonga South West/Aparo |
Nigeria |
44 |
200 |
|
Deep water |
| ||||
|
Browse (BCT) LNG |
Australia |
34 |
310 |
>10 |
Integrated gas |
| ||||
|
Carmon Creek |
Canada |
100 |
80 |
|
Future opportunities |
| ||||
|
Erha North Phase 3 |
Nigeria |
44 |
60 |
|
Deep water |
| ||||
|
Gas to Transport |
USA/ |
100 |
|
0.5 |
Integrated gas |
| ||||
|
Gbaran Ubie Phase 2 |
Nigeria |
30 |
165 |
|
Future opportunities |
| ||||
|
Linnorm |
Norway |
30 |
50 |
|
Upstream engine |
| ||||
|
ML South |
Brunei |
35 |
30 |
|
Upstream engine |
| ||||
|
North American |
USA/ |
Various |
>170[B] |
|
Resources plays |
| ||||
|
North American tight gas |
USA/ |
Various |
~200[B] |
|
Resources plays |
| ||||
|
Project Q (Al Karaana |
Qatar |
20 |
|
|
Downstream engine |
| ||||
|
Rabab Harweel |
Oman |
34 |
40 |
|
Upstream engine |
| ||||
|
Stones |
USA |
60 |
60 |
|
Deep water |
|