You are here:

LNG and GTL

  Download XLS

LNG REGASIFICATION TERMINALS (AT DECEMBER 31, 2014)

Project name

Location

Shell capacity rights (mtpa)

Capacity right period

Status

Shell interest (%)

Start-up date

[A]

100% capacity rights are held by Gas del Litoral joint venture with which Shell has a contract to supply 75% of the volumes.

[B]

Capacity rights have a cancellation notice period of three months.

[C]

100% capacity rights are held by Hazira joint venture with which Shell has a contract to supply 74% of the volumes.

Altamira

Tamaulipas, Mexico

3.3[A]

from 2006

In operation

Leased

2006

Barcelona

Barcelona, Spain

0.1

2010–2020[B]

In operation

Leased

1969

Costa Azul

Baja California, Mexico

2.7

2008–2028

In operation

Leased

2008

Cove Point

Lusby, MD, USA

1.8

2003–2023

In operation

Leased

2003

Elba Expansion

Elba Island, GA, USA

4.2

2010–2035

In operation

Leased

2010

Elba Island

Elba Island, GA, USA

2.8

2006–2036

In operation

Leased

2006

Hazira

Gujarat, India

2.2[C]

from 2005

In operation

74

2005

Hazira debottle­necking

Gujarat, India

1.5[C]

from 2013

In operation

74

2013

  Download XLS

LNG LIQUEFACTION PLANTS IN OPERATION (AT DECEMBER 31, 2014)

 

Location

Shell interest
(%)[A]

100% capacity
(mtpa)[B]

[A]

Interest may be held via indirect shareholding.

[B]

As reported by the operator.

[C]

Our Interest in the Dua Plant due to expire in 2015.

Atlantic LNG

Point Fortin

20–25

14.8

Australia North West Shelf

Karratha

19

16.3

Australia Pluto 1

Karratha

12

4.3

Brunei LNG

Lumut

25

7.8

Malaysia LNG (Dua) [C]

Bintulu

15

9.6

Malaysia LNG (Tiga)

Bintulu

15

7.7

Nigeria LNG

Bonny

26

22.0

Oman LNG

Sur

30

7.1

Peru LNG

Pampa Melchorita

20

4.5

Qalhat (Oman) LNG

Sur

11

3.7

Qatargas 4

Ras Laffan

30

7.8

Sakhalin LNG

Prigorodnoye

27.5

9.6

  Download XLS

LNG LIQUEFACTION PLANTS UNDER CONSTRUCTION

 

Location

Shell interest
(%)

100% capacity
(mtpa)

[A]

Location pending final investment decision.

Gorgon

Barrow Island

25

15.3

MMLS LNG

Moveable units[A]

49

2.5

Prelude

Offshore Australia

67.5

3.6

  Download XLS

GTL PLANTS IN OPERATION (AT DECEMBER 31, 2014)

 

Country

Shell interest
(%)

100% capacity
(b/d)

SMDS (Bintulu)

Malaysia

72

14,700

Pearl

Qatar

100

140,000

  Download XLS

SHELL SHARE OF EQUITY LNG SALES VOLUMES

MILLION TONNES

 

2014

2013

2012

2011

2010

Australia

3.7

3.7

3.6

3.1

3.4

Brunei

1.5

1.7

1.7

1.7

1.7

Malaysia

2.7

2.6

2.5

2.4

2.4

Nigeria

5.0

4.4

5.1

5.0

4.5

Oman

1.8

2.0

1.9

2.0

2.0

Peru

0.8

Qatar

2.4

2.3

2.4

1.7

Sakhalin

2.9

2.9

3.0

2.9

2.8

Trinidad and Tobago

3.2

Total

24.0

19.6

20.2

18.8

16.8