Download XLS |
LNG REGASIFICATION TERMINALS (AT DECEMBER 31, 2013) |
||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Project name |
Location |
Shell capacity rights (mtpa) |
Capacity right period |
Status |
Shell interest (%) |
Start-up date |
||||||
|
||||||||||||
Altamira |
Tamaulipas, Mexico |
3.3[A] |
from 2006 |
In operation |
Leased |
2006 |
||||||
Barcelona |
Barcelona, Spain |
0.1 |
2010–2020[B] |
In operation |
Leased |
1969 |
||||||
Costa Azul |
Baja California, Mexico |
2.9 |
2008–2028 |
In operation |
Leased |
2008 |
||||||
Cove Point |
Lusby, MD, USA |
1.8 |
2003–2023 |
In operation |
Leased |
2003 |
||||||
Elba Expansion |
Elba Island, GA, USA |
4.2 |
2010–2035 |
In operation |
Leased |
2010 |
||||||
Elba Island |
Elba Island, GA, USA |
2.8 |
2006–2036 |
In operation |
Leased |
2006 |
||||||
Hazira |
Gujarat, India |
2.2[C] |
from 2005 |
In operation |
74 |
2005 |
||||||
Hazira debottlenecking |
Gujarat, India |
1.5[C] |
from 2013 |
in operation |
74 |
2013 |
Download XLS |
LNG LIQUEFACTION PLANTS IN OPERATION (AT DECEMBER 31, 2013) |
|||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Location |
Shell interest |
100% capacity |
||||||||||
|
|||||||||||||
Australia North West Shelf |
Karratha |
20.5 |
16.3 |
||||||||||
Australia Pluto 1 |
Karratha |
20.8[D] |
4.3 |
||||||||||
Brunei LNG |
Lumut |
25.0 |
7.8 |
||||||||||
Malaysia LNG (Dua and Tiga) [E] |
Bintulu |
15.0 |
17.3 |
||||||||||
Nigeria LNG |
Bonny |
25.6 |
22.0 |
||||||||||
Oman LNG |
Sur |
30.0 |
7.1 |
||||||||||
Qalhat (Oman) LNG |
Sur |
11.0 |
3.7 |
||||||||||
Qatargas 4 |
Ras Laffan |
30.0 |
7.8 |
||||||||||
Sakhalin LNG |
Prigorodnoye |
27.5 |
9.6 |
Download XLS |
LNG LIQUEFACTION PLANTS UNDER CONSTRUCTION |
|||||
---|---|---|---|---|---|
|
Location |
Shell interest |
100% capacity |
||
|
|||||
Gorgon |
Barrow Island |
25.0 |
~15 |
||
MMLS LNG (Elba) |
Elba Island, GA, USA |
49.0 |
2.5 |
||
Prelude |
Offshore Australia |
67.5 |
3.6 |
||
Wheatstone [A] |
Onslow |
6.4 |
8.9 |
Download XLS |
GTL PLANTS IN OPERATION (AT DECEMBER 31, 2013) |
|||
---|---|---|---|
|
Country |
Shell interest |
100% capacity |
Bintulu |
Malaysia |
72 |
14,700 |
Pearl |
Qatar |
100 |
140,000 |
Download XLS |
SHELL SHARE OF EQUITY LNG SALES VOLUMES |
MILLION TONNES |
||||
---|---|---|---|---|---|
|
2013 |
2012 |
2011 |
2010 |
2009 |
Australia |
3.7 |
3.6 |
3.1 |
3.4 |
3.2 |
Brunei |
1.7 |
1.7 |
1.7 |
1.7 |
1.6 |
Malaysia |
2.6 |
2.5 |
2.4 |
2.4 |
2.2 |
Nigeria |
4.4 |
5.1 |
5.0 |
4.5 |
2.9 |
Oman |
2.0 |
1.9 |
2.0 |
2.0 |
2.1 |
Qatar |
2.3 |
2.4 |
1.7 |
– |
– |
Sakhalin |
2.9 |
3.0 |
2.9 |
2.8 |
1.4 |
Total |
19.6 |
20.2 |
18.8 |
16.8 |
13.4 |