You are here:

LNG and GTL

 Download XLS

LNG REGASIFICATION TERMINALS (AT DECEMBER 31, 2012)

Project name

Location

Shell capacity rights (mtpa)

Capacity right period

Status

Shell interest (%)

Start-up date

[A]

100% capacity rights are held by Gas del Litoral JV with which Shell has a contract to supply 75% of the volumes.

[B]

Capacity rights have a cancellation notice period of three months.

[C]

100% capacity rights are held by Hazira JV with which Shell has a contract to supply 74% of the volumes.

Altamira

Tamaulipas, Mexico

3.3[A]

from 2006

In operation

Leased

2006

Barcelona

Barcelona, Spain

0.1

2010–2020[B]

In operation

Leased

1969

Costa Azul

Baja California, Mexico

2.9

2008–2028

In operation

Leased

2008

Cove Point

Lusby, MD, USA

1.8

2003–2023

In operation

Leased

2003

Elba Expansion

Elba Island, GA, USA

4.2

2010–2035

In operation

Leased

2010

Elba Island

Elba Island, GA, USA

2.8

2006–2036

In operation

Leased

2006

Hazira

Gujarat, India

2.2[C]

from 2005

In operation

74

2005

Hazira Expansion

Gujarat, India

1.5[C]

from 2013

Under construction

74

2013

 Download XLS

LNG LIQUEFACTION PLANTS IN OPERATION (AT DECEMBER 31, 2012)

 

Location

Shell interest
(%)[A]

100% capacity
(mtpa)[B]

[A]

Interest may be held via indirect shareholding.

[B]

As reported by the operator.

[C]

Based on 90% Woodside shareholding in the Pluto 1 plant.

[D]

Our interests in Dua and Tiga plants are due to expire in 2015 and 2023 respectively.

Australia North West Shelf

Karratha

21

16.3

Australia Pluto 1

Karratha

21[C]

4.3

Brunei LNG

Lumut

25

7.8

Malaysia LNG (Dua and Tiga)

Bintulu

15

17.3[D]

Nigeria LNG

Bonny

26

22.0

Oman LNG

Sur

30

7.1

Qalhat (Oman) LNG

Sur

11

3.7

Qatargas 4

Ras Laffan

30

7.8

Sakhalin LNG

Prigorodnoye

27.5

9.6

 Download XLS

LNG LIQUEFACTION PLANTS UNDER CONSTRUCTION (AT DECEMBER 31, 2012)

 

Location

Shell interest
(%)

100% capacity
(mtpa)

[A]

We divested a further 5% interest in Prelude during the first quarter 2013, reducing our interest to 67.5%.

Gorgon

Barrow Island

25.0

15.3

Prelude

Offshore Australia

72.5[A]

3.6

Wheatstone

Onslow

6.4

8.9

 Download XLS

GTL PLANTS IN OPERATION (AT DECEMBER 31, 2012)

 

Country

Shell interest
(%)

100% capacity
(b/d)

Bintulu

Malaysia

72

14,700

Pearl

Qatar

100

140,000

 Download XLS

SHELL SHARE OF LNG SALES VOLUMES

MILLION TONNES

 

2012

2011

2010

2009

2008

Australia

3.6

3.1

3.4

3.2

2.6

Brunei

1.7

1.7

1.7

1.6

1.8

Malaysia

2.5

2.4

2.4

2.2

2.3

Nigeria

5.1

5.0

4.5

2.9

4.2

Oman

1.9

2.0

2.0

2.1

2.2

Qatar

2.4

1.7

Sakhalin

3.0

2.9

2.8

1.4

Total

20.2

18.8

16.8

13.4

13.1